EN
RU
We in social networks
Apply for investment project
Ask a question/
send a message
About Sevastopol
For Investors
Advantages
Media
Contacts
Investment map
Free economic zone
Investor support
Procedure for consideration of appeals
My business
Corporation
for development
of Sevastopol
Department for
economic development
Investment map
Free economic zone
Investor support
Procedure for consideration of appeals
Main page
For Investors
Infrastructure development
Planned infrastructure facilities
Planned infrastructure facilities
Construction of water supply networks Cape Fiolent
Implementation period:
2023-2024
Funding amount, million rubles:
534,27
Details
Reconstruction of heating networks from the boiler house of Kamyshovaya Bay to TK-26, Sevastopol
Implementation period:
2018-2021
Funding amount, million rubles:
327,79
Details
Reconstruction of the emergency water supply system along M. Biryuzova street, 26-36, Du 400mm, L-149m
Implementation period:
2017-2018
Funding amount, million rubles:
20,51
Details
Reconstruction Musson emergency water pipe 20 from the SU-DN 600mm L = 85m; DN500mm L = 175m
Implementation period:
2018
Funding amount, million rubles:
21,25
Details
Reconstruction of the emergency water supply system along the streets of Tolstoy-Kovpak-Kharkovskaya, Du 600 mm L = 450m
Implementation period:
2018
Funding amount, million rubles:
34,28
Details
Reconstruction of emergency water supply, Gray warehouses, Du 400mm L = 246m
Implementation period:
2017
Funding amount, million rubles:
8,16
Details
Reconstruction of the emergency water supply system on General Ostryakova street, 35-39 Du200mm L = 300m
Implementation period:
2017-2018
Funding amount, million rubles:
6,10
Details
Reconstruction of the emergency water supply system in the area of Khrustaleva street, 177 (5 km), trolleybus control room, Du400mm
Implementation period:
2017
Funding amount, million rubles:
4,31
Details
Reconstruction of the emergency water supply system from GU-13 to GU-4, D-500mm
Implementation period:
2017-2020
Funding amount, million rubles:
36,87
Details
Reconstruction of the water supply system, General Ostryakova Avenue, 90 - Pozharova Street (Circus), Du-600mm
Implementation period:
2018-2021
Funding amount, million rubles:
529,28
Details
Reconstruction of the emergency water supply system from GU-13 to GU-4, Du-500mm (2nd stage)
Implementation period:
2018-2022
Funding amount, million rubles:
196,84
Details
Reconstruction of WWTP in the village of Orlovka (with an increase in productivity from 0.4 to 3.0 thousand cubic meters per day)
Implementation period:
2019-2022
Funding amount, million rubles:
707,50
Details
Construction of local treatment facilities (LTF) of surface runoffs No.4 (LTF No.4) with deepwater release in the area of Quarantine Bay, main collectors for collection and discharge of storm drainage water at LTF No.4 and storm sewage networks in the are
Implementation period:
2021-2024
Funding amount, million rubles:
5 093,27
Details
Construction of sewage treatment facilities (WWTP) in the village of Dalnee (item VIR)
Implementation period:
2019-2021
Funding amount, million rubles:
76,02
Details
Design and construction of sewage treatment facilities "Southern", Sevastopol
Implementation period:
2016-2024
Funding amount, million rubles:
11 055,99
Details
Sewerage st. Decembrists, Sevastopol
Implementation period:
2018-2021
Funding amount, million rubles:
23,09
Details
Sewerage networks on Gagarin Avenue, Sevastopol
Implementation period:
2020-2021
Funding amount, million rubles:
18,90
Details
Construction of a sewage system for receiving effluents from a residential building on 5 Morekhodnaya Street and military unit facilities, Sevastopol
Implementation period:
2021
Funding amount, million rubles:
19,32
Details
Martynovsky sewer collector, Sevastopol
Implementation period:
2018-2022
Funding amount, million rubles:
592,75
Details
Water supply in the villages of Reserve and Goncharnoye, 1st stage
Implementation period:
2024
Funding amount, million rubles:
85,00
Details
Reconstruction of the water main from 9 Lazarevskaya street to Ushakov square, Du-300mm, L-750m; Du-400mm, L-750m; DN-500mm, L-1050m
Implementation period:
2018-2021
Funding amount, million rubles:
240,70
Details
Reconstruction with an increase in the diameter of the water conduit from GU-3 to the Yalta Ring Du-400mm
Implementation period:
2018-2024
Funding amount, million rubles:
208,41
Details
Reconstruction of the water conduit VU-7 - Lazarevskaya street, Du-400mm
Implementation period:
2018-2021
Funding amount, million rubles:
323,24
Details
Reconstruction of the water conduit VU-7-VU-20, Du-500mm
Implementation period:
2018-2022
Funding amount, million rubles:
327,50
Details
←
ctrl
previous
next
ctrl
→
Pages:
1
2
3
...
8
9